Rauma sawmill
Rauma sawmill in figures
Read more about the Rauma sawmill
24/7 Uninterrupted process The sawmill will run 24 hours a day, every day of the year.
250 Sawline speed
40 Logs per minute The sawline’s processing speed is three times faster than a conventional sawline.
1 s Speed of sawing one log A pine log is sawn in just over a second.
m/ min
The processing and sawing speed of the 110-metre sawline is up to 250 metres per minute.
750 Annual production The sawmill produces around
200 Value of the investment Metsä Fibre has invested EUR 200 million in the sawmill. This is the largest sawmill investment in Finland ever.
70 % Ratio of Finnish-origin equipment The vast majority of the sawmill’s equipment purchases, around 70%, were ordered from Finnish partners.
500 Jobs The sawmill employs around 100 people directly and about 500 more across its direct value chain.
000 m 3
million EUR
750,000 cubic metres of sawn pine timber per year. A total of 1.5 million cubic metres of logs will be used.
Main partners in the Rauma sawmill project
Heinolan Sahakoneet Oy Equipment for the kiln drying department with automatic load transfer
Nordautomation Oy Log sorting, the sawmill’s feed and bark processing equipment
C. Gunnarssons Verkstads AB Dry sorting and packaging equipment
Renholmen AB Green sorting lines and sticking and stacking lines
Veisto Oy High-speed sawline
Microtec Espoo Grading systems and software for the green and dry sorting units
Raumaster Paper Oy Organisation and load forming conveyors for sawn timber packages and an automatic loading system
Finnos Oy Log and sawing process
Raumaster Oy By-product conveyors and screening
Valon Kone Oy Debarkers
measurement systems and the production simulation system
Econia Expert services in the field of contractor liability and combat- ing the grey economy
Skanska Construction engineering work
Pinja Production control system
Roima Intelligence Oy Central control room
LM-Suomiset Oy Field construction work